News

Advanced Search

Output Slumps at Zimbabwe’s Murowa Mine

Dec 1, 2021 5:35 AM   By Rapaport News
Comment Comment Email Email Print Print Facebook Facebook Twitter Twitter Share Share


RAPAPORT... 
Diamond production at the RZM Murowa mine in Zimbabwe fell 43% year on year in the third quarter as operations focused on lower-grade ore.

RioZim, which owns the deposit, processed material from the K1 pit, as the higher-grade K2 section had reached the end of its life span, the Zimbabwean mining group said in a recent statement.

The company did not disclose total output. Its production for the first half of the year was 240,000 carats.

A program to increase Murowa’s processing capacity, known as the Crown Jewel Project, is progressing “at a slower pace than desired due to lack of adequate foreign currency,” RioZim added.

RioZim also operates gold mines across Zimbabwe, with production at the sites slipping 7% year on year for the quarter amid power shortages and volatile market conditions. The company’s base-metal deposit is under care and maintenance.

Image: The Murowa mine in Zimbabwe. (RioZim)
Tags: Crown Jewel Project, gold, mining, Murowa, Murowa mine, Rapaport News, RioZim, RZM Murowa, Zimbabwe
Similar Articles
Rio Tinto Diavik diamonds 140Diavik Production Falls in 2021
Jan 18, 2022
Production at the Diavik mine in Canada dropped 6% year on year in 2021, owner Rio Tinto said Tuesday.Output
Comments: (0)  Add comment Add Comment
Arrange Comments Last to First
© Copyright 1978-2022 by Rapaport USA Inc. All rights reserved. Index®, RapNet®, Rapaport®, PriceGrid™, Diamonds.Net™, and JNS®; are registered TradeMarks.
While the information presented is from sources we believe reliable, we do not guarantee the accuracy or validity of any information presented by Rapaport or the views expressed by users of our internet service.